
全部服務
專案物流與超限貨物
為超限、重吊及多段運輸貨物提供工程化方案,逐段規劃並含許可申請與吊裝研究。
Project cargo is planned backwards from the site. We start with the crane position and the last hundred metres, then work back to the factory gate — because that is the part that goes wrong when it is left until last.
Every move comes with a written method statement, a permit pack and a named engineer who is on site for the lift.
核心能力
路線勘察對起運地至現場之間的每一處限制進行實地勘察。
許可與護送全部報備、許可與護送安排由我們代為處理。
現場監督每次關鍵吊裝均有 Movntra 工程師在場。

