
全部服务
项目物流与超限货物
为超限、重吊及多段运输货物提供工程化方案,逐段规划并含许可申请与吊装研究。
Project cargo is planned backwards from the site. We start with the crane position and the last hundred metres, then work back to the factory gate — because that is the part that goes wrong when it is left until last.
Every move comes with a written method statement, a permit pack and a named engineer who is on site for the lift.
核心能力
路线勘察对起运地至现场之间的每一处限制进行实地勘察。
许可与护送全部报备、许可与护送安排由我们代为处理。
现场监督每次关键吊装均有 Movntra 工程师在场。

