Skip to content
New weekly LCL service from Shanghai to Rotterdam — 24 day transit.
MovntraLogistics
Abnormal load under escort
All services

Project & Abnormal Loads

Engineered moves for out-of-gauge, heavy-lift and multi-leg cargo, planned route by route with permits and lift studies included.

Project cargo is planned backwards from the site. We start with the crane position and the last hundred metres, then work back to the factory gate — because that is the part that goes wrong when it is left until last.

Every move comes with a written method statement, a permit pack and a named engineer who is on site for the lift.

Key capabilities

Route surveysPhysical surveys of every constraint between origin and site.
Permits & escortsAll notifications, permits and escort arrangements handled for you.
On-site supervisionA Movntra engineer present for every critical lift.
Abnormal load under escort

Get a quote

Engineered moves for out-of-gauge, heavy-lift and multi-leg cargo, planned route by route with permits and lift studies included.

Get a quote