Cliente

Catorce secciones de turbina por una vía única

Un parque eólico en ladera con una única ruta viable, una grúa reservada al día y sin margen para un izaje mal planificado.

Helios Renewables
14Secciones entregadas
100%Entregadas en ventana
0Horas de grúa en espera

The site was reachable by exactly one road, and that road had three pinch points our first survey flagged as impassable for a 63-metre blade section.

Rather than accept the constraint, our engineers walked the route a second time with the haulier and the local authority. Two of the three pinch points were solved by temporary verge reinforcement; the third needed a street furniture removal that we arranged and reinstated within the same 48-hour window.

All fourteen sections arrived inside their scheduled slots, and the crane recorded zero standby hours across the programme.