Wind turbine section on a hillside road
Client

Quatorze sections de turbine sur une route à voie unique

Un parc éolien à flanc de colline avec un seul itinéraire viable, une grue réservée au jour près et aucune marge d’erreur.

Helios Renewables
14Sections livrées
100%Livrées dans la fenêtre
0Heures d’attente de grue

The site was reachable by exactly one road, and that road had three pinch points our first survey flagged as impassable for a 63-metre blade section.

Rather than accept the constraint, our engineers walked the route a second time with the haulier and the local authority. Two of the three pinch points were solved by temporary verge reinforcement; the third needed a street furniture removal that we arranged and reinstated within the same 48-hour window.

All fourteen sections arrived inside their scheduled slots, and the crane recorded zero standby hours across the programme.